Maintenance

Maintenance DEMC column

Article number 1061

Price on request

Maintenance DEMC column

1. Examination of the delivered device on transport damages
2. Incoming inspection
- Setup of the column in a complete U-SMPS system
- Test measurements with calibration aerosol
3. Disassembly and cleaning of the column
- Check for scratches on electrode surface and polishing if
necessary
- Cleaning and replacement of laminator
- Leak test
4. Evaluation of the overall function and test measurements with
complete U-SMPS system and calibration aerosol
5. Issue of a new calibration certificate
6. Packing of the column ready for dispatch
Small repairs are included

Related products

Filter

Ambient Protection