Maintenance
Maintenance Fidas® 200, Fidas® 200 E
Article number 1938
Price on request
Maintenance including calibration Maintenance Fidas® 200, Fidas® 200 E
1. Examination of the delivered device on transport damages
2. Entry inspection
- Check of the LEDs
- Examine on contamination
- Test measurements with MonoDust 1500
3. Check and readjustment of the electrical components
- Check of the photomultiplier
- Lamp power supply (electricity/power)
- Signal cards (adjustment of the offset, characteristic, signal
period
measurement, coincidence recognition)
- Offset measurement of the electronic of the signal aquisition
- Check of the Integrated suction pump
- Calibration of the volume flow
4. Check of the optical system of the sensor
- Clean the optics
- Control and adjustment of the optical light paths in the sensor
5. Firmware
- Examination on perfect installation
6. Evaluation of the overall function and calibration
- Adjustment of the sensitivity with reference particles (MonoDust
1500) for different measuring ranges
- Test measurements for the evaluation of the overall function
7. Issue of a calibration certificate for the aerosol spectrometer
with equipment data, date, settings, graphics of the test
measurements
8. Issue of a calibration certificate for the measurement of PM 2.5
and PM 10 with equipment data, date, settings, graphics of the
test measurements.
- Check of linearity of the performance-tested reference devices
with serial number 0111 or 0112
- Determining of the correction factor
- Validation of the linearity after adaptation of the correction factor
9 . Packing of the devices / make ready for dispatch
Small repairs are included
Excluded are the following spare parts, which must be ordered
separately:
- Suction pump assembly
- Photomultiplier
- Circuit board MMS-SLA
- Touchscreen computer
- Circuit board MMS-MIO
- Circuit board MMS-Pt100
- MFM10 mass flow meter
- Assembly LED unit replacement
- Assembly aerosol sensor
- Power supply 300W
- Power supply PC
Spare parts installed by us carry 18 months of limited warranty.
2. Entry inspection
- Check of the LEDs
- Examine on contamination
- Test measurements with MonoDust 1500
3. Check and readjustment of the electrical components
- Check of the photomultiplier
- Lamp power supply (electricity/power)
- Signal cards (adjustment of the offset, characteristic, signal
period
measurement, coincidence recognition)
- Offset measurement of the electronic of the signal aquisition
- Check of the Integrated suction pump
- Calibration of the volume flow
4. Check of the optical system of the sensor
- Clean the optics
- Control and adjustment of the optical light paths in the sensor
5. Firmware
- Examination on perfect installation
6. Evaluation of the overall function and calibration
- Adjustment of the sensitivity with reference particles (MonoDust
1500) for different measuring ranges
- Test measurements for the evaluation of the overall function
7. Issue of a calibration certificate for the aerosol spectrometer
with equipment data, date, settings, graphics of the test
measurements
8. Issue of a calibration certificate for the measurement of PM 2.5
and PM 10 with equipment data, date, settings, graphics of the
test measurements.
- Check of linearity of the performance-tested reference devices
with serial number 0111 or 0112
- Determining of the correction factor
- Validation of the linearity after adaptation of the correction factor
9 . Packing of the devices / make ready for dispatch
Small repairs are included
Excluded are the following spare parts, which must be ordered
separately:
- Suction pump assembly
- Photomultiplier
- Circuit board MMS-SLA
- Touchscreen computer
- Circuit board MMS-MIO
- Circuit board MMS-Pt100
- MFM10 mass flow meter
- Assembly LED unit replacement
- Assembly aerosol sensor
- Power supply 300W
- Power supply PC
Spare parts installed by us carry 18 months of limited warranty.
Related products
Filter
Polyurethane tube
Sensor-/Actor cable, 8 pin VA, 10 m
Gravimetric filter holder
IADS Extended
Aerosol tube
Sealing ring set
Metal roof gland with locking nut
Cable for WS300 weather station
Bottom flange Sigma 2 head
Sensor-/Actor cable, 8 pin VA, 10 m
Polyurethane tube
Sensor-/Actor cable, 8 pin VA, 10 m
Connecting line
Plastic cap
Sigma-2 sampling head
Ambient Protection
IADS standard