Maintenance
Maintenance Fidas® 200, Fidas® 200 E
Article number 1938
Price on request
Maintenance including calibration Maintenance Fidas® 200, Fidas® 200 E
1. Examination of the delivered device on transport damages
2. Entry inspection
- Check of the LEDs
- Examine on contamination
- Test measurements with MonoDust 1500
3. Check and readjustment of the electrical components
- Check of the photomultiplier
- Lamp power supply (electricity/power)
- Signal cards (adjustment of the offset, characteristic, signal
period
measurement, coincidence recognition)
- Offset measurement of the electronic of the signal aquisition
- Check of the Integrated suction pump
- Calibration of the volume flow
4. Check of the optical system of the sensor
- Clean the optics
- Control and adjustment of the optical light paths in the sensor
5. Firmware
- Examination on perfect installation
6. Evaluation of the overall function and calibration
- Adjustment of the sensitivity with reference particles (MonoDust
1500) for different measuring ranges
- Test measurements for the evaluation of the overall function
7. Issue of a calibration certificate for the aerosol spectrometer
with equipment data, date, settings, graphics of the test
measurements
8. Issue of a calibration certificate for the measurement of PM 2.5
and PM 10 with equipment data, date, settings, graphics of the
test measurements.
- Check of linearity of the performance-tested reference devices
with serial number 0111 or 0112
- Determining of the correction factor
- Validation of the linearity after adaptation of the correction factor
9 . Packing of the devices / make ready for dispatch
Small repairs are included
Excluded are the following spare parts, which must be ordered
separately:
- Suction pump assembly
- Photomultiplier
- Circuit board MMS-SLA
- Touchscreen computer
- Circuit board MMS-MIO
- Circuit board MMS-Pt100
- MFM10 mass flow meter
- Assembly LED unit replacement
- Assembly aerosol sensor
- Power supply 300W
- Power supply PC
Spare parts installed by us carry 18 months of limited warranty.
2. Entry inspection
- Check of the LEDs
- Examine on contamination
- Test measurements with MonoDust 1500
3. Check and readjustment of the electrical components
- Check of the photomultiplier
- Lamp power supply (electricity/power)
- Signal cards (adjustment of the offset, characteristic, signal
period
measurement, coincidence recognition)
- Offset measurement of the electronic of the signal aquisition
- Check of the Integrated suction pump
- Calibration of the volume flow
4. Check of the optical system of the sensor
- Clean the optics
- Control and adjustment of the optical light paths in the sensor
5. Firmware
- Examination on perfect installation
6. Evaluation of the overall function and calibration
- Adjustment of the sensitivity with reference particles (MonoDust
1500) for different measuring ranges
- Test measurements for the evaluation of the overall function
7. Issue of a calibration certificate for the aerosol spectrometer
with equipment data, date, settings, graphics of the test
measurements
8. Issue of a calibration certificate for the measurement of PM 2.5
and PM 10 with equipment data, date, settings, graphics of the
test measurements.
- Check of linearity of the performance-tested reference devices
with serial number 0111 or 0112
- Determining of the correction factor
- Validation of the linearity after adaptation of the correction factor
9 . Packing of the devices / make ready for dispatch
Small repairs are included
Excluded are the following spare parts, which must be ordered
separately:
- Suction pump assembly
- Photomultiplier
- Circuit board MMS-SLA
- Touchscreen computer
- Circuit board MMS-MIO
- Circuit board MMS-Pt100
- MFM10 mass flow meter
- Assembly LED unit replacement
- Assembly aerosol sensor
- Power supply 300W
- Power supply PC
Spare parts installed by us carry 18 months of limited warranty.
Related products
Filter
Polyurethane tube
Weather station
Gravimetric filter holder
IADS Extended
Aerosol tube
Sealing ring set
Metal roof gland with locking nut
Cable for WS300 weather station
Bottom flange Sigma 2 head
Weather station
Polyurethane tube
Weather station
Connecting line
Plastic cap
Sigma-2 sampling head
Ambient Protection
IADS standard